The concrete's been poured in the basement, crawl-space and garage. I thought there was supposed to be second crawl-space under the front of the house but so far nothing's been poured there. The front porch hasn't been poured yet but from looking at the rest of the neighborhood that appears to get done later on.
Looks like the sewer and sump lines have been laid. Also the electric meter box has been installed. Cable, electric and gas lines have also been marked off.
Come on, rough carpentry!
Saturday, August 4, 2007